    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:3325次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應(yīng)對設(shè)備管口、預(yù)埋件、預(yù)留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進(jìn)行復(fù)核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應(yīng)按圖紙的要求進(jìn)行調(diào)整,調(diào)整方法可以利用支座達(dá)到坡度要求,焊縫應(yīng)設(shè)置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設(shè)備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應(yīng)遠(yuǎn)離設(shè)備,以避免焊接產(chǎn)生應(yīng)力對傳動設(shè)備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機(jī)器連接前,應(yīng)防止強(qiáng)力相對,在自由狀態(tài)下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應(yīng)垂直安裝,在投入試運(yùn)行時,要及時調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進(jìn)行,開啟和回座壓力要符合設(shè)計(jì)文件的規(guī)定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設(shè)計(jì)文件核對其型號,并按介質(zhì)流向確定其安裝方向。當(dāng)閥門與管道以法蘭或螺紋方式連接時,閥門應(yīng)在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時,閥門不得關(guān)閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    久久精品国产免费观看99| 无码av中文一区二区三区| 久久久久久曰本av免费免费| 亚洲乱码日产精品bd在线观看| 人妖另类综合视频网站| 少妇高潮呻吟求饶视频网站| 精品激情成人影院在线播放| 成人免费无码大片a毛片软件 | 欧美多毛肥胖老妇做爰| 亚欧视频无码在线观看| 午夜视频一区二区三区在线观看| 欧美成人秋霞久久aa片| 99久久国产露脸精品竹菊传媒| 韩国女主播一区二区在线观看| 免费观看国产激情视频在线观看| 久久久亚洲av波多野结衣| 女人扒开下面无遮挡| 欧美日韩中文字幕日韩欧美| 亚洲中文中文字幕乱码| 精品无人码麻豆乱码1区2区| 激情偷乱人伦小说视频在线| 精品国产亚洲av麻豆尤物| 国产激情综合五月久久| 99精品久久精品一区二区| 99久久精品自在自看国产| 另类人妖在线观看一区二区| 国产精品国产三级国产密月| 国产av无码专区亚洲awww| 高清国产一级毛片国语| 亚洲一区二区三区四区精品| 男女猛烈拍拍拍无挡视频| 亚洲精品无码人妻无码 | 97久久综合精品国产丝袜长腿| 无码人妻精品一区二区三区夜夜嗨 | 97久久香蕉国产线看观看| 在线a人片免费观看国产| 久久人妻中文字幕精品一区二区| 蜜臀av999无码精品国产专区| 久久国产精品二区99| 久久精品成人一区二区三区蜜臀| 曰韩内射六十七十老熟女影视|